The Central Utah Water Conservancy District (CUWCD), together with Ames Construction, are installing the Salem Reach 1 segment of the Spanish Fork/Santaquin Pipeline--a 60 inch steel pipe to be buried within the Salem Canal Road from Elk Ridge Drive to Woodland Hills Drive. The existing Salem Canal (open canal and shallow pipe) will be removed, lowered and replaced with a 42-inch HDPE pipeline.

 

In addition, Salem City is using this opportunity to install new storm drains along portions of Salem Canal Road, 300 West, 100 East, 500 East, and 300 South, as well as additional curb and a public trail along the north side of Salem Canal Road (see map below). Also,  Salem Canal Road will be straightened by shifting the roadway southward between 500 East and 240 East and installing a full-width city street. After all the work is complete, a new asphalt surface will be placed along Salem Canal Road.  

PROJECT AREA MAP

Project Map with Streets, canal and trail.png
SCR Before After.png

SALEM CANAL ROAD

ABOUT

UPDATES

The project is nearing completion; the Salem Canal has been removed and replaced with underground pipe, installation of the 60-inch pipe is complete, and storm drains have been installed in various locations. However, construction crews continue some work along various sections of Salem Canal Road to finish utility work, fencing, landscaping, and road reconstruction.

ROADWAYS
Salem Canal Road (from Woodland Hills Drive to Elk Ridge Drive) is now open again for traffic in all directions. However, work on manholes and other work continues along other various portions of the roadway; please continue to drive slowly and pay close attention to maneuver safely around the cones and work zones.

LANDSCAPING
Crews are now onsite and have begun work for irrigation/sprinkler and landscaping restoration. 

SAFETY
PLEASE, BE CAREFUL! For your own safety and others, pay close attention to workers, signs and equipment, and maintain a safe distance when driving, biking or walking near construction work zones. 

NO ENTRY ZONES
Signs and barriers are positioned for your safety. Do not move existing barricades, signs, or enter taped-off areas; violators may be fined. 

START DATE

MAY 2022

EST. COMPLETION DATE

APRIL 2024

WORK DAYS

MON - FRI

WORK HOURS

7:00 AM - 6:00 PM

PROJECTS

PHOTOS

CONTACT

CONTACT

Contact Us

HOTLINE: 877-458-2463

Please contact the public information team with any questions or concerns. 

STAY INFORMED

We encourage you to sign up for the weekly email updates so that you are aware of potential impacts. Send an email to salemreach1@gmail.com and enter "Salem Reach Updates" in the subject line. 

Thanks for submitting!

bottom of page